Piktogramm Wissensportal

Wissensportal

Refurbishment of the Copenhagen Transmission Grid – Project Planning and Execution

This paper presents the planning and execution of a cable project in an urban environment where tunnels are not deemed a viable option. Planning during different stages of the project is presented and a number of different obstacles encountered are discussed. It is shown that there are several important parameters which ensures a successful project. 1. Proper and thorough planning 2. Solid cable and cable system design 3. Pragmatic approach to problem solving in the field 4. A good cooperation with the civil contractor who shall solve problems in a practical way.

10th International Conference on Insulated Power Cables
R. Olsen, D. Brøndum, W. Griffioen, K. H. Thomsen, G. Stadie